The different scenarios
The choice of options can be multiple.
β’ If the EGLD is $30, the current options presented are:
Option 1: Delay, wait a better time to convert EGLD to USDC;
Option 2: Convert the EGLD and start production of a single watch model;
Option 3: Setting up an extra cost for all models;
Option 4: Setting up an extra cost for the premium Made model.
β’ If the EGLD is $50, the current options presented are:
Option 1: Delay, wait a better time to convert EGLD to USDC;
Option 2: Produce only one watch model;
Option 3: Produce only two models;
Option 4: Setting up an extra cost;
β’ If the EGLD is $75, the current options presented are:
Option 1: Delay, wait a better time to convert EGLD to USDC;
Option 2: Convert EGLD to USDC and start production of 1 model;
Option 3: Convert EGLD to USDC and start production of 2 models;
Option 4: Convert EGLD to USDC and start production of 3 models;
Option 5: Setting up an extra cost (for all models);
Option 6: Setting up an extra cost (for the premium watch model);
β’ If the EGLD is $125, production will be assured for all 3 models.
Last updated
Was this helpful?